ARC Application

Please enable JavaScript in your browser to complete this form.
Builder's ARC Application - Step 1 of 4

Stone Lake Trails HOA Logo Transparent

PLANS REVIEW APPLICATION | HOME & CONSTRUCTION REQUIREMENTS

All construction plans for new, remodel or rebuild (including outbuildings, fences,swimming pools, retaining walls,
and landscaping) must be reviewed by the Architectural Review Committee (ARC) prior to commencement
of any on-site construction, including grading.

BUILDING SITE

PLANS PACKAGE

 *All Drawings Must Be To Scale.

House, Outbuildings, Flatwork, Retaining Walls, Fences, Temporary Erosion Controls, etc.
Dimensioned & detailed. Outbuilding plans must be included.
Include roof pitch(es). List roof materials & color.
Must be approved prior to submission.
Exterior veneer shown for each wall.
May be submitted during construction (prior to installation), include tree removal details.

SQFT. PER FLOOR

First Floor

Second Floor

Third Floor

TOTAL SQFT.

PLANS REVIEW APPLICATION | HOME & CONSTRUCTION REQUIREMENTS

PLANS REVIEW APPLICATION | HOME & CONSTRUCTION REQUIREMENTS

    1. GENERAL

    a. Application for ARC Plans Review | The plans review application package, whether for new, remodel or rebuild construction, must be submitted to the ARC for review at least 30 days prior to commencement of construction or landscaping on the site.

    b. Damage to Stone Lake Trails Property | Builders are responsible and will be required to reimburse the cost of any damage to subdivision property related to construction of the project.

    c. Fires | On-site burning and open fires are not permitted.

    d. Hours of Construction | 6am to 6pm, 7 days a week. Need to notify HOA if different.

    e. Insurance – Builders Risk & General Liability | The Builder must have and maintain in force, throughout construction of the project, Builders All-Risk and General Liability Insurance providing coverage for all aspects of the project.

    f. Lawn, Tree & Shrub Cuttings | Landscape maintenance debris must be properly disposed of. Grass cuttings, removed trees, and tree or shrub trimmings are not permitted to be disposed of on vacant lots or land within the subdivision.

    g. Mail | Pick-up and delivery of residential mail is from cluster mailbox locations. Individual home mailboxes are not permitted.

    h. Permits | The Builder must secure all respective regulatory permits prior to commencing related construction work, including a SWPPP

    i. Plan Modification During Construction | Plans for project modifications, subsequent to ARC review of the plans must be submitted to the ARC at least 10 days prior to commencement of construction of such modifications.

    j. Redi-Mix Concrete “Wash-Out” & Spills | Concrete washout will be the responsibility of each Builder. Wash-out areas need to be established on the lot that the home is being built. Concrete spills beyond the boundary of the lot, must be promptly cleaned up

    k. Traffic | Builder and Lot Owners are responsible for all site-related traffic and must ensure that adjacent properties are not blocked by equipment or vehicle parking, temporary or otherwise. Speeding or reckless driving is not tolerated. The Builder must notify subcontractors and suppliers to observe all traffic rules of the subdivision and must ensure they are complied with.

    2. SITE

    a. Lot Maintenance | Builders and Lot Owners are responsible during, prior to and following construction activities to keep the Property free of weeds, dead trees, broken and falling tree limbs, debris, or other unsightly materials.

    b. Adjacent Property | Builders and Lot Owners are responsible to protect adjacent properties from damage due to their construction activities. Vacant lots owned by others are not to be used for access, staging, storage or materials, placement of trash or construction debris, temporary or otherwise, unless written permission is given by that Lot Owner.

    c. Environmental | Builders must file and comply with a storm water pollution plan with the Texas Commission on Environmental Quality. Prior to and during construction, Builders must install and/or maintain temporary erosion control elements, including but not limited to: silt fencing or other silt filtration devices and stone construction access to comply with all storm water pollution prevention regulations.

    d. Clean Up | Trash containment and removal and orderly staging of construction materials must be monitored and controlled daily.

    e. Construction Debris, Equipment & Temporary Toilets | Within 14 days of completion of construction or dwelling occupancy, whichever occurs first, all construction debris, equipment, surplus materials and temporary toilets must be removed from the site.

    f. Driveways | Must be concrete, brick, masonry pavers, or other material acceptable to the ARC. Gravel is not considered an acceptable driveway material.

    g. Site Fill & Grading | Fill operations, including imported fill, must be immediately leveled to facilitate subsequent site maintenance and mowing.

    h. Fencing | Per Restrictive Covenants. Individual lot restrictions vary.

    i. Gas & Oil Tanks | Gas and oil tanks are permitted only when installed below ground level and in compliance with all governing regulations.

    k. Landscaping | Per Restrictive Covenants. Lot restrictions vary with location of lot.
    Placement of Improvements | It is recommended but not required that the physical location of improvements be set by a professional surveyor, to reduce the risk of encroaching on easements and setback lines. Encroachments must be corrected.

    l. Sales or Lease of the Property | Builders must make any buyer of the property aware of the existence of the Property Owners’ Association, the Restrictive Covenants, and these General Construction Guidelines, prior to execution of any contract of sale or lease of the property.

    m. Signs | Except for one builder and one Realtor sign, advertising the property for sale, exterior signs on the property are not permitted, except during special events such as the Parade of Homes. “For Sale” signs may not exceed 24” x 30” and no more than 3’ in height unless prior approval is received from the ARC. Except for developer signs marketing the subdivision, directional arrow signs are not permitted inside Stone Lake Trails.

    n. Storm Water | Builders may not alter, divert or restrict subdivision storm water drainage by any means, including grading or installation of fences, retaining walls, structures, walks, driveways, swimming pools, landscaping or any other feature. Fencing cannot be installed within surface drainage easements and structures.

    o. Street Mud | Builders are responsible to remove any dirt or mud infiltration from their site to the streets, subdivision storm drainage system or adjacent property. Damage from such infiltration is the responsibility of the Builder.

    p. Temporary Toilet | Upon commencement of construction activities, a temporary toilet facility must be placed and secured from wind and vandals and must remain until construction and lot clean up are completed.

    q. Drainage Areas | All drainage swales (sizes and depths) and culverts shall be installed per the attached drainage drawing. No fencing is allowed across a drainage area.

    3. BUILDING | General Guide Only –
    Refer to governing Restrictive Covenants for actual requirements

    a. Exterior Finishes | Refer to Restrictive Covenants for minimum masonry requirements.

    b. Construction Time | Construction of the exterior of the main dwelling, including roof, windows, doors and masonry, must be completed within 24 months of commencement of construction.

    c. Minimum Living Area | The minimum air-conditioned living area of the main dwelling must not be less than as stipulated in applicable Stone Lake Trails Restrictive Covenants.

    4. COMPLIANCE

    a. Regulations | In addition to complying with all governmental regulations governing Stone Lake Trails, Builders must comply with these “Home & Construction Requirements” and the Stone Lake Trails “Restrictive Covenants.

    Hand-Deliver or Mail-In Process
    ARC Application & Plans

    1. PRINT ARC APPLICATION

    a. Download ARC Application
    b. Complete Application
    c. Attach Two(2) complete sets of plans
    to application; one set will be returned following the ARC review.

     

    2. HAND-DELIVER OR MAIL TO:

    Mike Emmons
    6405 Springwood Ct
    Temple, TX 76502

    Email: [email protected]

    Join our community

    Email

    location

    FM 2410,  Harker Heights, TX 76548

    www.stonelaketrails-hoa.com