Builders’
General Info
- GENERAL
- Application for ARC Plans Review
The plans review application package, whether for new, remodel or rebuild construction must be submitted to the Architectural Review Committee (ARC) for review at least 30 days prior to commencement of construction or landscaping on the site. Septic system permit is required before ARC can accept plans. - Damage to Stone Lake Trails Property
Builders are responsible and will be required to reimburse the cost of any damage to subdivision property related to construction of the project. - Fires
On-site burning and open fires are not permitted. - Hours of Construction
6am to 6pm, 7 days a week. Need to notify HOA if different. - Insurance – Builders Risk & General Liability
The Builder must have and maintain in force, throughout construction of the project, Builders All-Risk and General Liability Insurance providing coverage for all aspects of the project. - Lawn, Tree & Shrub Cuttings
Landscape maintenance debris must be properly disposed of. Grass cuttings, removed trees, and tree or shrub trimmings are not permitted to be disposed of on vacant lots or land within the subdivision. - Mail
Pick-up and delivery of residential mail is from cluster mailbox locations. Individual home mailboxes are not permitted. - Permits
The Builder must secure all respective regulatory permits prior to commencing related construction work, including a SWPPP. - Plan Modification During Construction
Plans for project modifications, subsequent to ARC review of the plans must be submitted to the ARC at least 10 days prior to commencement of construction of such modifications. - Redi-Mix Concrete “Wash-Out” & Spills
Concrete washout will be the responsibility of each Builder. Wash-out areas need to be established on the lot that the home is being built. Concrete spills beyond the boundary of the lot, must be promptly cleaned up. - Traffic
Builder and Lot Owners are responsible for all site-related traffic and must ensure that adjacent properties are not blocked by equipment or vehicle parking, temporary or otherwise. Speeding or reckless driving is not tolerated. The Builder must notify subcontractors and suppliers to observe all traffic rules of the subdivision and must ensure they are complied with.
- Application for ARC Plans Review
discover. enjoy. experience.
Join our community
location
FM 2410, Harker Heights, TX 76548
www.stonelaketrails-hoa.com